Investigation 1 · TEWS-A3opened 12 Oct 2026, 10:02 by K. Venkat3 plan versions · 5 Runs · 1 branch · 1 fork

Anchor and mooring of tsunami buoy A3: a suction caisson in soft clay at 3,850 m that survives a Mw 9 earthquake, a turbidity current and a 100-year cyclone

Open · 1 Run running
  • KV
  • MK
  • AR
7.1 of 10 CU reserved · 5.9 spent · 2.9 left
Needs you
G3 Anchor design waiting on your sign-off · due 18:00 · branch Ø4.0 × 8.0 m · Run 5 · then A. Rao
1 result stale since polyester certificate v2 · line utilisation and fatigue, Run 4 step 14, carried into Run 5
Monday 12 October 2026
K. Venkat10:02
Plan the anchor and mooring of buoy A3 from the attached core, catalogue, hindcast and drawing. It has to survive the Mw 9 it exists to detect, then a cyclone on the softened clay, and keep detecting. Start with the site and the hazards; add capacity and installation once the site basis is through. Flag anything you would have to assume.Workbench
GC-7_core_log.pdfvane su · 9.4 m regional_seismic_catalogue.csv1,284 events cyclone_hindcast_40yr.nc40 years TEWS-A3-S-02_caisson.pdfrev A polyester_certificate.pdfv1
Elidyne10:03Workbench

I read the core log, the catalogue, the hindcast, the caisson drawing and the line certificate. Station A3 sits in 3,850 m of water in the Andaman Sea, 212 km west of the Sunda trench. Core GC-7 gives soft pelagic clay, su = 3 + 1.4z kPa with sensitivity 3. Drawing S-02 rev A shows a steel suction caisson Ø3.5 × 7.0 m, 14 t, holding an inverse catenary of 120 m chain, 4,300 m polyester, 3.2 t of buoyancy and 60 m of chain under a 2.6 m discus buoy of 4.2 t.

The design needs inputs these files do not give: . Two of them stop the analysis, the design earthquake and a turbidity current velocity. The catalogue lists three megathrust segments within 400 km but names no design event, and nothing in the files measures a turbidity current, so I have not picked either. Until both are settled I can plan the site model only.

K. Venkat10:14
Design for a Mw 9.0 megathrust at 180 km. Take the turbidity current at 2.5 m/s as an assumption and keep it open.Workbench
Elidyne10:15Workbench

The design event is a Mw 9.0 megathrust at 180 km, cited to the catalogue segment you named at 10:14. Turbidity enters at 2.5 m/s as an assumption; it opens finding T-6, and every result that uses it carries the label. With both settled I can plan the site model and the hazard loads.

Plan v1 · checked · 0 holesApproved by K. Venkat · 10:20 · reserved 4.2 CU

Lanes 1–2: site and station model, hazard loads

Design for a Mw 9.0 megathrust at 180 km. Take the turbidity current at 2.5 m/s as an assumption and keep it open.K. Venkat · 10:14
9 stepsNew 92 decisions recorded7 missing inputs open · none blockingreserve 4.2 CU
1 Site and station model 4 steps G1 Site basis 2 Hazard loads 5 steps G2 Hazard basis
Runs 1–2 partly superseded by v2
Runs 1–2 · plan v1 · from background execution
  • Run 1 started on meridian-hpc · OpenSees 3.7 and MoorDyn 2.3 · 8 cores · Run 2 queued for 128 cores
  • Lane 1 done: station model assembled · 146 elements · static equilibrium found
  • Gate G1 Site basis opened for M. Krishnan. Run 2 continues; its results are held until G1 is decided.
1 Site and station model 2 Hazard loads · running since 11:05
Wednesday 14 October 2026
Gate G1 · Site basisChanges requested by M. Krishnan · 11:40
Reviewer M. Krishnan, geotechnics · opened 12 Oct 11:05 · records from Run 1, lane 1
Elevation · station A3 2.6 m discus · 4.2 t chain 120 m polyester 4,300 m buoyancy 3.2 t chain60 m BPR-3 seabed 3,850 m caisson at the seabed · water depth not to scale Section · caisson in GC-7 clay Ø3.5 m mudline 7.0 mskirt padeye 4.6 mline at 32° 010su, kPa meanlower su = 3 + 1.4z kPa · St 3 · dashed: lower bound
as modelled: mean su and padeyeinstallation reads the tip hereSchematic, not to scale
Soil
core GC-7, 9.4 m · vane su = 3 + 1.4z kPa · sensitivity 3 · unit weight extrapolated below 6 m
Station model
146 elements · buoy 1, line 132 lumped masses, floats 4, caisson macro-element 9 · static equilibrium found
Load path
buoy → chain 120 m → polyester 4,300 m → buoyancy 3.2 t → chain 60 m → padeye → caisson → clay
Installation
penetration screen read the mean su line; plug-heave allowable taken from the mean
Missing inputs
7 open · 2 bear on this gate: cyclic strength tests, unit weight below 6 m
Changes requested by M. Krishnan · 11:40
Use the lower-bound su for installation, not the mean.
Elidyne drafted plan v2 from this note: installation reads the lower-bound line su = 2.2 + 1.2z kPa, and capacity keeps the mean line, which the note does not change. Lane 2 continued while the gate was open; its results were held until the decision.
Elidyne11:42from the G1 note

From M. Krishnan’s note I changed one input: installation now reads the lower-bound su line, 2.2 + 1.2z kPa, instead of the mean. Capacity keeps the mean. Three steps read the installation line and run again. Five finished steps do not, and are carried from Runs 1–2 at no charge. As you asked on Monday, I also added lanes 3 and 4, anchor capacity and installation, on the drawing’s Ø3.5 × 7.0 m caisson. The seismic site response is still running under v1; choose what happens to it.

Plan v2 · from v1 at gate G1 · checked · 0 holesApproved by K. Venkat · 12:05 · reserved 1.4 CU

Installation on lower-bound su; adds anchor capacity and installation

Use the lower-bound su for installation, not the mean.M. Krishnan at gate G1 · 11:40
Keep 5 Re-run 3 New 5 Dropped 0 In flight 1 +1.4 CU

Re-run 3est. 0.14 CU

Soil design lines · Lane 1 · step 1
installation line: mean su → lower-bound su 2.2 + 1.2z kPa · from the G1 note
est. 0.02 CU
Penetration screen · Lane 1 · step 4
input changed: installation su line · self-weight and suction penetration to 7.0 m
est. 0.08 CU
Load case matrix · Lane 2 · step 9
input changed: LC5 installation reads the lower-bound line · not yet run in Run 2
est. 0.04 CU

New 5est. 1.26 CU

Capacity envelope, intact · Lane 3 · step 10
added: H–V capacity of the caisson at three load inclinations, DNV-RP-E303
est. 0.42 CU
Post-quake strength degradation · Lane 3 · step 11
added: capacity on clay softened by the Mw 9 cycles
est. 0.36 CU
Capacity checks by load case · Lane 3 · step 12
added: factor of safety for LC1–LC4 against the owner criterion FoS ≥ 2.0
est. 0.18 CU
Installation suction and plug heave · Lane 4 · step 13
added: required against allowable suction on the lower-bound line
est. 0.18 CU
Line utilisation and fatigue · Lane 4 · step 14
added: chain and polyester utilisation, top-chain fatigue life
est. 0.12 CU

Keep 50 CU · linked, not recomputed

Dropped 0

Nothing dropped.

In flight 1as settled

Seismic site response · Lane 2 · step 7
Running under v1 in Run 2 since 13 Oct 21:50 on 128 cores. It reads the mean su line, which the note does not change.
What happens to the seismic site response
When it finishes, its fingerprint is compared with v2. A match is carried at 0 CU; anything else runs again in Run 3. Chosen at approval · finished 13:18 · matched · carried.
as settled
Cost of approval+1.4 CUre-run and new only · the 5 kept steps charge 0 CU
Runs 3 and 4 started under v2 · 5 records carried from Runs 1–2 at 0 CU · 8 steps dispatched
Seismic site response finished in Run 2 · fingerprint matches v2 · carried into Run 3 · Runs 1–2 closed: 3.5 CU spent, 0.7 released
Run 4 finished · installation and line checks · 0.4 CU · results held until G1 and G2
G1 Site basis accepted by M. Krishnan · pinned 12 records of the v2 site model
Run 3 lane 3 started · caisson capacity at 3 load inclinations on meridian-hpc
K. Venkat16:45
What governs the load on the anchor?Instant · about main · v2 · Runs 3–4
Elidyne16:45Instant · from records

The cyclone, pulling on clay the earthquake has already softened. The 100-year cyclone (Hs 9.4 m, Tp 13.8 s, wind 38 m/s) drives the line tension to at 32° to the seabed. The Mw 9 adds little load at the padeye but costs the clay its strength: 15 equivalent cycles at 0.28 g give . A 2.5 m/s turbidity current adds of drag on the caisson, an assumption until T-6 is closed. So the case to watch is LC3, the quake followed by the cyclone.

Based on lanes 1–2. Lane 3 (capacity) is running; about 35 min left.

While you were away · 7 days

14 Oct 16:46 to 21 Oct 11:20 · 4 updates
  • Run 3 finished · capacity at 3 inclinations · 0.8 of 1.0 CU · checks held until G2
  • Deferred answer posted · to your question at 16:45
  • 1 result stale · D. Gupta uploaded polyester certificate v2
  • G2 Hazard basis accepted by A. Rao · turbidity velocity recorded as an assumption
Elidyne14 Oct 17:24deferred answer to your question at 16:45

Lane 3 finished. The softened clay governs, not the cyclone alone. After the Mw 9 the clay keeps 82 % of its strength, and the capacity of the Ø3.5 × 7.0 m caisson with the line at 32° falls from 392 kN to . Under the cyclone peak on that softened clay the padeye moves .

Based on lanes 1–3 of Runs 1–3 · plan v2. G2 not yet decided; the load-case checks are held.
Run 3 finished · 3 steps run · 0.8 of 1.0 CU spent, 0.2 released · load-case checks held until G2
Tuesday 20 October 2026
Polyester certificate v2 uploaded by D. Gupta · dynamic stiffness revised, MBL 1,450 kN unchanged · 1 result stale: line utilisation and fatigue, Run 4 step 14 · a revision is proposed, nothing re-ran
Wednesday 21 October 2026
G2 Hazard basis accepted by A. Rao · pinned 14 records · turbidity 2.5 m/s recorded as an assumption, finding T-6 open · load-case checks released
Completed · 1 design check failsRuns 3–4plan v2 · checks released 11:051.2 of 1.4 CU · 0.2 released

Lanes 1–4 · anchor Ø3.5 × 7.0 m from drawing TEWS-A3-S-02

14 steps · 6 carried at 0 CU · 8 run · 1 result stale

Summary

Result document excerpt · thread density

On clay the Mw 9 has softened, the drawing’s caisson does not hold with the margin you set. The quake-then-cyclone case LC3 gives a factor of safety of , below 2.0 for every one of the 20 cyclone seeds. The cyclone on intact clay passes at , and installation on lower-bound clay has a margin of .

Capacity · Ø3.5 × 7.0 m 0200400 0200400 H at padeye, kN V, kN intactafter Mw 9 demand 185 intact 392 322 after quake needed at FoS 2.0 · 370 32° Line tension · 100-yr cyclone 060120180 0100200 time around the storm peak, s tension, kN mean 90 peak 185 kN · seed 7 of 20
needed capacity, peak demandSolid: intact · dashed: after the Mw 9 · LC3 demand from Run 2, carried

Key results

4 of 12 quantities · 1 fails · 1 stale
QuantityValueDesign checkVerdictSource
Anchor FoS · LC3 quake then cyclone1.66–1.83 over the 20 seeds Fails · FoS < 2.0 Accepted[6]
Anchor FoS · LC1 cyclone, intact clay2.02–2.23 over the 20 seeds Passes Accepted[6]
Installation margin · plug heaveLC5 · lower-bound su · 30 of 87 kPa Passes Accepted[7]
Polyester utilisation · LC1 peakcarried from Run 4 · step 14 Stale · input changed: polyester certificate v2 Passed on certificate v1 Stale[8]
G3 Anchor design not opened on main · LC3 is below FoS 2.0; A. Rao is asked once a size passes
Monday 2 November 2026
K. Venkat14:02
Try Ø4.0 × 8.0 m, and add the calamity sequences on it.Workbench · main · v2 · Runs 3–4
Elidyne14:03Workbench

I’ll branch from v2 so the main line stays as it is. A scaling screen on Run 3 puts Ø4.0 × 8.0 m near 2.7 after the quake and Ø4.5 × 9.0 m near 3.6, which carries 6 t more steel than the criterion needs. Every step that depends on the caisson size runs again; the other six are carried at no charge, and lane 5 adds the sequences in the time domain.

Branch “Ø4.0 × 8.0 m” from v2active · compare pending
in branch Ø4.0 × 8.0 m
Plan v3 · from v2 · checked · 0 holesApproved by K. Venkat · 14:06 · reserved 2.4 CU

Caisson Ø3.5 × 7.0 → Ø4.0 × 8.0 m, adds calamity sequences

Try Ø4.0 × 8.0 m, and add the calamity sequences on it.K. Venkat · 14:02
Keep 6 Re-run 8 New 2 Dropped 0 +2.4 CU
Polyester certificate v2 is not applied on this branch either. The kept line check still reads certificate v1, so its utilisation stays stale until you revise.
in branch Ø4.0 × 8.0 m
Run 5 · plan v3 · from background execution
  • Queued on meridian-hpc · 128 cores · position 1
  • Running · 6 records carried at 0 CU · 10 steps dispatched
  • Lanes 3–4 done: capacity, checks and installation · gate G3 opened on this branch
  • Capacity check LC3 at , held until G3
  • Lane 5: calamity sequences running · 14 of 20 seeds
Spent1.2 CU
Reserved2.4 CU
Investigation left2.9 CU
1 Site 2 Hazards 3 Capacity 4 Installation G3 waiting on you 5 Sequences 14 of 20 seeds
in branch Ø4.0 × 8.0 m
Gate G3 · Anchor designwaiting on you · due 18:00
Reviewer: you, as branch owner, then A. Rao, offshore structures · opened 16:40 · records from Run 5, lanes 3–4
  • Solver converged at every load step · OpenSees 3.7 macro-element · 0 warnings
  • Equilibrium at the padeye, LC3: applied 185.0 kN at 32°, reaction 185.0 kN
  • Independent limit-equilibrium check, DNV-RP-E303: intact capacity within 4.1 % of the macro-element
  • Cyclone seeds 20 of 20: LC3 FoS 2.62–2.89; post-quake strength from correlation, no cyclic tests on GC-7
  • Installation on lower-bound su: suction required 38 kPa, allowable 92 kPa, margin 2.4
Lane 5 continues while this gate is open; its results are held until you decide.
K. Venkat opened Compare · main v2 with branch v3
in branch Ø4.0 × 8.0 m

Compare · main v2 with branch v3

Compare pending · 1 quantity still running
Runs 3–4 (Ø3.5 × 7.0 m) against Run 5 (Ø4.0 × 8.0 m) · aligned by quantity · G3 is open on the branch
main v2 · Ø3.5 × 7.0 mbranch v3 · Ø4.0 × 8.0 mFoS = 2.0
fails below 2.0 1.52.02.53.03.54.04.5 Anchor factor of safety, line at 32° LC1cyc LC2eq LC3q→c LC4turb 2.123.35 2.594.10 1.742.75 2.93.9
QuantityMain v2 · Ø3.5 × 7.0Branch v3 · Ø4.0 × 8.0Difference
Anchor FoS · LC3 quake then cyclone1.74 fails1.66–1.832.75 passes2.62–2.89+1.01
Anchor FoS · LC1 cyclone, intact clay2.122.02–2.233.353.20–3.52+1.23
Capacity at 32° · intact / after Mw 9392 / 322 kN620 / 508 kN+228 / +186 kN
Installation margin · lower-bound su2.930 of 87 kPa2.438 of 92 kPa−0.5
Turbidity drag on caisson, 2.5 m/s assumed11 kN14 kN+3 kN · +27 %
Caisson tilt · quake then cyclonenot runlane 5 not in v2runningpending
Caisson steel14 t18 t+4 t · +29 %
Compute4.7 CURuns 1–41.2 of 2.4 CURun 5 · 6 carried at 0separate lines
Ranges are the spread over the 20 cyclone seeds, lowest to highest peak demand. They are not a statistical interval.
Plan differencecaisson Ø3.5 × 7.0 → Ø4.0 × 8.0 m · re-run 8 · keep 6 · new 2 ·
TradeLC3 passes at 2.75; 4 t more steel, installation margin 2.9 → 2.4
Forked to “Aftershock sensitivity” by K. Venkat · 17:02 · from v3 · carried the question, plan v3 as a template and 3 records
A change to a plan makes a new version. Nothing runs until it is approved.